I finally got around to finishing the laundry room. There wasn't much I hadn't done in this room. The only new item was moving the gas lines that feed the dryer.
The only real secret there is to shut off the main gas line to the house before starting.
Here's the before shots:
Showing posts with label Framing. Show all posts
Showing posts with label Framing. Show all posts
Sunday, March 8, 2015
Monday, December 29, 2014
Bedroom 3 Remodel
This bedroom was pretty much the same process as Bedroom 2 was (see previous post). The only difference was that there was a closet door that I moved from this bedroom to the hallway.
Here's the pics from move in day.
Here's the pics from move in day.
Sunday, March 30, 2014
The Family Bathroom Project
I've finally finished another room in the house. The upstairs hallway bathroom.
I'm going to mix this post up a bit, and put all the pics side by side: pre-remodel next to the finished result of the same part of the room. That should better show off how drastic the change is.
I'm really happy with how this turned out. All told it was around 90 hours of work, over the last few months. It cost around $3,500.
Here's how it looked before I started. At this point I had already replaced the old rotten wooden window, as well as the toilet. The floor was vinyl, and the fixtures were dated back to the 70's.
In this pic you can see I redid the trim, and tiled the floor.
I'm going to mix this post up a bit, and put all the pics side by side: pre-remodel next to the finished result of the same part of the room. That should better show off how drastic the change is.
I'm really happy with how this turned out. All told it was around 90 hours of work, over the last few months. It cost around $3,500.
Here's how it looked before I started. At this point I had already replaced the old rotten wooden window, as well as the toilet. The floor was vinyl, and the fixtures were dated back to the 70's.
In this pic you can see I redid the trim, and tiled the floor.
Thursday, January 23, 2014
The Master Bathroom Project
When I purchased this home, there was no Master Bathroom. There was this really weird side room in the hallway, that shared a wall with the Master Bedroom.
As you can see, it was some kind of craft room or something; maybe an office.
As you can see, it was some kind of craft room or something; maybe an office.
Labels:
Base Trim,
Bathtub,
Casement,
Doors,
Drywall,
Drywall Texture,
Electrical,
Framing,
Home Remodel,
Interior,
Master Bathroom,
Paint,
Plumbing,
Primer,
Shower,
Tile Floor
Monday, November 11, 2013
The Hallway Remodel
The hallway was extremely dated when I moved in. It had pretty bad paneling on the walls, and really old pineapple looking lights on the ceiling. It was always pretty dark up there, as there were only two lights total. The only switch for the lights was down the stairs om the level below the upstairs, in the living room area. Lastly, the ceiling paint was peeling pretty bad in front of the bathroom doorway, due to humidity.
As you can see, it wasn't very pretty!
As you can see, it wasn't very pretty!
Monday, October 7, 2013
The Master Bedroom Remodel
This was one of the larger projects I had taken on at the time. It involved not only drywall work, but also electrical, framing, the addition of a window, moving ventilation returns, running coax cable, and more.
Here's how it looked the day I moved in.
The doors and fixtures were really dated looking. The cable (coax) wire was coming right out of the floor. The colors were not to my liking. The place was a bit like a cave with only the patio doors for outside light and air.
Here's how it looked the day I moved in.
The doors and fixtures were really dated looking. The cable (coax) wire was coming right out of the floor. The colors were not to my liking. The place was a bit like a cave with only the patio doors for outside light and air.
Subscribe to:
Posts (Atom)