I've finally finished another room in the house. The upstairs hallway bathroom.
I'm going to mix this post up a bit, and put all the pics side by side: pre-remodel next to the finished result of the same part of the room. That should better show off how drastic the change is.
I'm really happy with how this turned out. All told it was around 90 hours of work, over the last few months. It cost around $3,500.
Here's how it looked before I started. At this point I had already replaced the old rotten wooden window, as well as the toilet. The floor was vinyl, and the fixtures were dated back to the 70's.
In this pic you can see I redid the trim, and tiled the floor.