Monday, October 7, 2013

The Master Bedroom Remodel

This was one of the larger projects I had taken on at the time. It involved not only drywall work, but also electrical, framing, the addition of a window, moving ventilation returns, running coax cable, and more.

Here's how it looked the day I moved in.
The doors and fixtures were really dated looking. The cable (coax) wire was coming right out of the floor. The colors were not to my liking. The place was a bit like a cave with only the patio doors for outside light and air.